AS-i
Hong Kong International …
Introduction I finished this project in 2026. As a control engineer, I mainly looked after the interfacing work with the HKIA Terminal 1, the SkyPier terminal, the screening system and the self bag drop. I supported the commissioning of equipment such as the out of gauge lift, the carrier stacker …